Note that customized REB670 is delivered without any configuration. Thus the complete IED engineering shall be done by the
customer or its system integrator. In order to secure proper operation of the busbar protection it is strictly recommended to
always start engineering work from the PCM600 project for the pre-configured REB670 which is the closest to the actual
application. Then, necessary modifications shall be applied in order to adopt the customized IED configuration to suite the
actual station layout. The PCM600 project for the pre-configured REB670 IEDs is available in the Connectivity Package DVD.