EasyManua.ls Logo

ABB REC650 - Setting Guidelines

ABB REC650
370 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15.4.3 Setting guidelines
There are two possible ways to place the IED in the TestMode= Enabled” state. This
means that if the IED is set to normal operation (TestMode = Disabled), but the functions
are still shown being in the test mode, the input signal INPUT on the TESTMODE
function block must be activated in the configuration.
Forcing of binary output signals is only possible when the IED is in test mode.
15.5 Change lock CHNGLCK
15.5.1 Identification
Function description IEC 61850
identification
IEC 60617
identification
ANSI/IEEE C37.2
device number
Change lock function CHNGLCK - -
15.5.2 Application
Change lock function CHNGLCK is used to block further changes to the IED
configuration once the commissioning is complete. The purpose is to make it impossible
to perform inadvertent IED configuration and setting changes.
However, when activated, CHNGLCK will still allow the following actions that does not
involve reconfiguring of the IED:
Monitoring
Reading events
Resetting events
Reading disturbance data
Clear disturbances
Reset LEDs
Reset counters and other runtime component states
Control operations
Set system time
Enter and exit from test mode
Change of active setting group
The binary input controlling the function is defined in ACT or SMT. The CHNGLCK
function is configured using ACT.
1MRK 511 286-UUS A Section 15
Basic IED functions
331
Application manual

Table of Contents

Other manuals for ABB REC650

Related product manuals