• general settings as shown in table 65.
• level supervision of active power as shown in table 66.
• calibration parameters as shown in table 67.
Table 65: General settings parameters for the Measurement function
Setting
Short Description Selected
value
Comments
Operation Operation Off/On On Function must be
On
PowAmpFact Amplitude factor to scale power
calculations
1.000 It can be used during
commissioning to achieve higher
measurement accuracy. Typically
no scaling is required
PowAngComp
Angle compensation for phase
shift between measured I & U
0.0 It can be used during
commissioning to achieve higher
measurement accuracy. Typically
no angle compensation is
required. As well here required
direction of P & Q measurement is
towards protected object (as per
IED internal default direction)
Mode Selection of measured current
and voltage
L1, L2, L3 All three phase-to-earth VT inputs
are available
k Low pass filter coefficient for
power measurement, U and I
0.00 Typically no additional filtering is
required
UGenZeroDb Zero point clamping in % of
Ubase
25 Set minimum voltage level to
25%. Voltage below 25% will force
S, P and Q to zero.
IGenZeroDb
Zero point clamping in % of Ibase 3 Set minimum current level to 3%.
Current below 3% will force S, P
and Q to zero.
UBase (set in
Global base)
Base setting for voltage level in
kV
400.00 Set rated OHL phase-to-phase
voltage
IBase (set in
Global base)
Base setting for current level in A 1000 Set rated primary CT current used
for OHL
SBase (set in
Global base)
Base Setting for power base in
MVA
1000 Set based on rated Power
Table 66: Settings parameters for level supervision
Setting
Short Description Selected
value
Comments
PMin
Minimum value -100 Minimum expected load
PMax
Minimum value 100 Maximum expected load
PZeroDb
Zero point clamping in 0.001% of
range
3000 Set zero point clamping to 60 MW
that is, 3% of 200 MW
PRepTyp
Reporting type db Select amplitude deadband
supervision
PDbRepInt
Cycl: Report interval (s), Db: In
0.001% of range, Int Db: In
0.001%s
2000
Set ±Δdb=40 MW that is, 2%
(larger changes than 40 MW will
be reported)
Table continues on next page
Section 17 1MRK 502 071-UEN -
Monitoring
630 Generator protection REG670 2.2 IEC and Injection equipment REX060, REX061, REX062
Application manual