Feeder protection and control / Feeder protection
16 ABB
Table 28. Transformer inrush detection, 3I2f> / 68
0.5...25 x In, in steps of 0.01
30%...50%, in steps of 5%
Table 29. Thermal overload protection, 3Ith> / 49
Initial thermal level of apparatus 0
Reference current leading to thermal
calculation “Ib”
0.1 … 1.5 x In, in steps of 0.1
Heating time constant of object ‘𝜏′
1.0…300 min, in steps of 1.0
Cooling time constant of object ‘𝜏
↓𝑠
‘
1.0…300 min, in steps of 1.0
Start inhibit value, startinhibit
Options for calculating thermal value
during power interruption, powerOFF
3% of 5time constant or ± 30s
¹
)
Options for calculating thermal image during power interruption shall be as below
1 = On restoration of power, new value of current after power on will be considered to calculate new value of
thermal image for interruption period Δt.
2 = On restoration of power, new value of thermal image is calculated for interruption period Δt considering that
current has remained constant value during power interruption.
3 = Power interruption of the IED assumes no change of thermal image during interruption period.
4 = Power interruption of the IED resets the thermal image to the set value defined by setting
0
.
Table 30. Phase discontinuity protection, I2/I1> / 46PD
Operate delay time, ‘tI2/I1>’
0.04… 64 s, in steps of 0.1
Block the phase discontinuity protection