Breaker failure protection (BFP) &KDSWHU
9HULI\LQJVHWWLQJVE\VHFRQGDU\
LQMHFWLRQ
%UHDNHUIDLOXUHSURWHFWLRQ%)3
Prepare the terminal for verification of settings as outlined in section “Preparing for
test” in this chapter.
Consider to release used start criteria. The trip is a pulse with a length of 150 ms. Fault
condition: the current in a phase must exceed the set IP> as latest within the set t1 time
after the START/STLN input is activated.
To verify the settings the following fault type should be tested:
One for a phase-to-earth fault
The breaker-failure protection should be tested in co-operation with some other func-
tions, and in particular with the protection and trip functions or via external start.
 9HULI\LQJWKHVHWWLQJV
3URFHGXUH
 $SSO\WKHIDXOWFRQGLWLRQZLWKDFXUUHQWEHORZVHW,3!
 5HSHDWWKHIDXOWFRQGLWLRQDQGLQFUHDVHWKHFXUUHQWLQVWHSXQ
WLOWULSDSSHDUV
 &RPSDUHWKHUHVXOWZLWKWKHVHW,3!
Note: If no I> check is set only back-up trip operate at set IP>.
 9HULI\LQJWKHUHWULSVHWWLQJ
Choose one of the test cases in 4.2 "Verifying the retrip setting" according to valid set-
ting.
 &KHFNLQJWKHUHWULSIXQFWLRQZLWKUHWULSVHWWRRII
3URFHGXUH
 6HW5HWULS7\SH 5HWULS2II
 $SSO\WKHIDXOWFRQGLWLRQZLWKFXUUHQWRYHUWKHVHWYDOXH
 9HULI\WKDWUHWULSLQSKDVH/LVQRWDFKLHYHG
 &KHFNLQJWKHUHWULSIXQFWLRQZLWKFXUUHQWFKHFN
3URFHGXUH
 6HW5HWULS7\SH ,!FKHFN