EasyManua.ls Logo

ABB Relion 670 series REC670 - Page 52

ABB Relion 670 series REC670
84 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Control
Table 52. Synchronizing, synchrocheck and energizing check SESRSYN
Function Range or value Accuracy
Phase shift, j
line
- j
bus
(-180 to 180) degrees -
Voltage ratio, U
bus
/U
line
0.500 - 2.000 -
Voltage high limit for synchronizing and synchrocheck (50.0-120.0)% of
UBaseBus and
UBaseLIne
± 0.5% of U
r
at U ≤ U
r
± 0.5% of U at U >U
r
Reset ratio, synchrocheck > 95% -
Frequency difference limit between bus and line for synchrocheck (0.003-1.000) Hz ± 2.0 mHz
Phase angle difference limit between bus and line for synchrocheck (5.0-90.0) degrees ± 2.0 degrees
Voltage difference limit between bus and line for synchronizing and
synchrocheck
(0.02-0.5) p.u ± 0.5% of U
r
Time delay output for synchrocheck (0.000-60.000) s ± 0.5% ± 10 ms
Frequency difference minimum limit for synchronizing (0.003-0.250) Hz ± 2.0 mHz
Frequency difference maximum limit for synchronizing (0.050-0.500) Hz ± 2.0 mHz
Maximum allowed frequency rate of change (0.000-0.500) Hz/s ± 10.0 mHz/s
Closing time of the breaker (0.000-60.000) s ± 0.5% ± 10 ms
Breaker closing pulse duration (0.000-60.000) s ± 0.5% ± 10 ms
tMaxSynch, which resets synchronizing function if no close has been
made before set time
(0.000-60.000) s ± 0.5% ± 10 ms
Minimum time to accept synchronizing conditions (0.000-60.000) s ± 0.5% ± 10 ms
Voltage high limit for energizing check (50.0-120.0)% of
UBaseBus and
UBaseLIne
± 0.5% of U
r
at U ≤ U
r
± 0.5% of U at U >U
r
Reset ratio, voltage high limit > 95% -
Voltage low limit for energizing check (10.0-80.0)% of
UBaseBus and
UBaseLine
± 0.5% of U
r
Reset ratio, voltage low limit < 105% -
Maximum voltage for energizing (50.0-180.0)% of
UBaseBus and/
or UBaseLIne
± 0.5% of U
r
at U ≤ U
r
± 0.5% of U at U >U
r
Time delay for energizing check (0.000-60.000) s ± 0.5% ± 10 ms
Operate time for synchrocheck function 160 ms typically -
Operate time for energizing function 80 ms typically -
Bay control REC670
1MRK511232-BEN E
Pre-configured
Product version: 1.2
52 ABB

Related product manuals