EasyManua.ls Logo

ABB Relion REM601 - Real Time Clock; Access Control; Power-ON Sequence

ABB Relion REM601
90 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1MDU07212-YN Rev. D Section 2
REF601/REJ601/REM601 overview
REF601 / REJ601 / REM601 15
Application Manual
Table 3: List of event types and related description, continue
Sr.
No.
Event type
Description
Data considered
30
Binary input
1, 2, 3, 4
On binary input 1, 2, 3, 4 activation and
deactivation respectively
BI 1 , BI 2 ,
BI 3 , BI 4
BI 1 , BI 2 ,
BI 3 , BI 4
31
Setting
parameter
change
OPTS parameter change value
OPTS - value
32
Start
An event for general start will be capture for
both rising and falling which will be from any
of start of I>,I>>, I>>> ,Io> ,Io>>, I2>, I2/I1>
Start
Start
33
Trip
An event for general trip will be capture for
both rising and falling which will be from any
of trip of I>,I>>, I>>> ,Io> ,Io>>, I2>, I2/I1>
and Thermal trip
Trip
Trip
34
Factory default
Event for factory default
Factory Default
2.4.4 Real Time Clock
IED comes with a real time clock with user settable date and time. Date can be set
in “DD/MM/YYYY” format and time can be set in “HH:MM:SS” format. The time
stamping have 1 ms resolution. RTC is used for time stamping the event logs and
as well as fault records. In case of power failure RTC will have a stored energy
backup for around 48 hrs. at ambient temperature when stored energy element is
fully charged. Initial time setting is “01/01/2011and “00:00:00:0000”.
2.4.5 Access Control
To protect the relay from unauthorized access and to maintain the integrity of
information, the relay is armed with a three level, role-based user authentication
system with individual password for the operator, engineer (Setting level) and
administrator level. With the Ver. 2.2 FP1 REF601/REJ601/REM601 supports two
modes for password handling:
1. a combination of different navigation keys (default mode)
2. alphanumeric password
2.4.6 Power-ON sequence
The Power-ON sequence takes around 6 sec.
In case the optional communication on MODBUS RTU / IEC 60870-5-103 is
present, the startup time takes around 40 sec.

Table of Contents

Related product manuals