2.3 Workflow
Make GOOSE connections
Export SCL files
from PCM 600
I
mport SCL files to
IET 600
and do
signal engineering
.
Export updated
SCL files from
IET 600
Import SCL files
600
Start
ACT
SMT
PST
GDE
SMT
CMT
ACT
Export
SCD
IET600
Import
SCD
IED
WRITE
End
Configure IED functionality
Parametrization
Signal engineering
Configure pages for local HMI
Save the work
between the
different steps
Project
Create plant structure and
insert IED objects
IEC 61850
DNP3
IEC 60870-5
-103
Modbus
Write configuration to IED
IEC 61850
Configuration tool
to PCM
GUID-D133E703-E669-40F3-86EE-828FEFAA7EE5 V1 EN
Figure 3: Protection relay engineering workflow proposal based on practical
experience and dependencies of the steps
It is possible to follow a different sequence based on the information available at the
start of the project. This means that several iterations may be needed to complete the
project.
PCM600 project setup
The plant structure is built according to the substation structure.
To add a protection relay to a project, a suitable connectivity package is needed.
Protection relays can be added either while connected or disconnected or through
other means such as an IED template.
IED objects are uniquely named within the PCM600 project.
Section 2 1MRS759117 A
Relay engineering process
20 REX640
Engineering Manual

Table of Contents

Other manuals for ABB RELION REX640

Related product manuals