EasyManua.ls Logo

ABB SF6 LTB 245E1 BLG 1002A - Inspection of the Puffer

ABB SF6 LTB 245E1 BLG 1002A
231 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Contact and puffer replacement
Overhaul Instructions
18
1HSB435409-201 enrev1
6.2 Inspection of the puffer
Move the contact springs upwards from position a to b. Lift off the pufferand check
that the sliding surfaces on the pull-rod are not worn.
Check that the nozzle is not punctured. Also check that the contact surfaces on the
puffer cylinder are not burnt or worn so that copper is visible.
Replace the entire puffer if it has burnt or worn surfaces or if the nozzle has been
punctured.
Figure 6-2. Puffer
Item
1 Nozzle
2 Pull-rod
3 Puffer cylinder
4 Bolt M8x16
5 Contact springs
1
2
Contact surface
3
B10061
4
5
Contact surface
b
a
TIGHTENING TORQUE
22.5 Nm

Table of Contents

Related product manuals