EasyManua.ls Logo

ABB SF6 LTB 245E1 BLG 1002A - Assembly Instructions

ABB SF6 LTB 245E1 BLG 1002A
231 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Assembly Instructions
1HSB435410-2 enrev1 i
LIST OF CONTENTS
1. General ................................................................................ 1
2. Safety................................................................................... 3
2.1 Warning text................................................................................... 3
2.2 Safety, general................................................................................ 4
3. Delivery ............................................................................... 5
3.1 Weights........................................................................................... 5
3.2 Unpacking ...................................................................................... 6
3.3 Storage before assembly ................................................................ 7
4. Assembly............................................................................. 9
4.1 Preparations.................................................................................... 9
4.2 Frame assembly............................................................................ 11
4.3 Assembling the frame on the foundation ..................................... 12
4.4 Assembling the circuit-breaker pole on the frame....................... 13
4.5 Preparations for assembling the operating mechanism and
protective tube.............................................................................. 15
4.6 Assembling the operating mechanism ......................................... 16
4.7 Assembling the protective tubes between the poles..................... 17
4.8 Final assembly of the circuit-breaker pole................................... 17
4.9 Assembling the pull-rods ............................................................. 18
4.10 Inspecting the bolted joints, etc.................................................... 23
5. Electrical connections ..................................................... 25
5.1 Connection of the operating mechanism...................................... 25
5.2 Assembly of busbars or overhead lines........................................ 25
5.3 Tensioning the closing springs..................................................... 26
6. Pressurising the poles..................................................... 27
6.1 Preparations.................................................................................. 27
6.2 Gas filling with SF6 gas............................................................... 28
6.3 Gas monitoring system................................................................. 31
6.4 Leakage test.................................................................................. 32
6.5 Final inspection of the pull-rod system........................................ 32
6.6 Fitting the signs and covers.......................................................... 34
7. Commissioning................................................................. 35
8. Operating values .............................................................. 37

Table of Contents

Related product manuals