EasyManua.ls Logo

ABB SF6 LTB 245E1 BLG 1002A - Assembling the Protective Tubes between the Poles; Final Assembly of the Circuit-Breaker Pole

ABB SF6 LTB 245E1 BLG 1002A
231 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Assembly Instructions
Assembly
1HSB435410-2 enrev1 17
4.7 Assembling the protective tubes between the poles
Fit the protective tubes with a pull-rod inserted in each tube, see Figure 4-10.
Tighten all bolted joints on the protective tube to 79 Nm.
Figure 4-10. Assembly of the protective tubes.
4.8 Final assembly of the circuit-breaker pole
Tighten the frame to the foundation using the upper nut with a tightening torque of
at least 300 Nm.
Tighten the poles to the frame with a tightening torque of at least 300 Nm.
Figure 4-11. Circuit-breaker pole on the frame.
Item
1 Bolts M12x50
Nuts M12
Washers 13x28x3
16 pcs.
16 pcs.
32 pcs.
B10073
1
TIGHTENING TORQUE
79 Nm
TIGHTENING TORQUE
300 Nm
B10132

Table of Contents