EasyManua.ls Logo

ABB TPL73-B12 - Page 75

ABB TPL73-B12
154 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation Manual / TPL73-B.. - 85-B11/ -B12
5 Maintenance / 5.5 Cleaning turbine blades and nozzle ring in opera-
tion
© Copyright 2018 . All rights reserved. HZTL2480_EN Revision D July 2018
Operating the integrated dry cleaning device
01 Granulate container (51502) 07 Combined air valve / Pressure-re-
lief valve (51504)
02 Cover cap (51503) 08 Clamp (51515)
03 Compressed air supply [4 to 10
bar]
09 Pipe elbow (51521)
04 Hose (51512) 10 Heat protection hose (51516)
05 On-Off valve (51505) 11 Screw insert (51514)
06 Ball valve (51513) 12 Cleaning instructions (51517)
CAUTION
The air system must be protected against overpressure (> 10 bar) .
Page 73 / 151

Table of Contents

Related product manuals