34
1
ZENITH ZTS(D) T-SERIES 1600-3000 A & ZTSCT T-SERIES 100-3000 A
SOURCE 2 priority (no generator)
Switch position I
Switch position II
Activate test on load
Cancel test on load
Elevator/pre-transfer signal
Elevator/post-transfer signal
Check source synchronization
—
Table 2.7 Closed Transition Switching Sequences, SOURCE 2 Priority (No Generator)