EasyManuals Logo

Absen AW Series User Manual

Absen AW Series
26 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #7 background imageLoading...
Page #7 background image
Service hotline400-700-3278
Preparation before installation
Site installation environment preparation
1. Conventional panels cannot be installed on the seashore, and panels with special anti-salt-alkali
materials can be installed on the seashore
2. The humidity at the installation site must not exceed 85RH;
3. The installation site temperature should be -20 ℃ ~ 50 ℃, and the panels with special low temperature
materials can be installed at -30 ℃ ~ 20 ℃.
Preparation of maintenance tools
List
Type
Acting on
Adjustable
wrench
Fix the connecting piece
of the box and tighten
the M10 * 60 bolt
Phillips
screwdriver
Disassembly module &
power supply &
receiving card & adaptor
plate
Hex key
Remove power box
multimeter
Measuring power lines
and distribution boxes
Small Phillips
screwdriver
Installing and removing
mask
Spirit level
Measuring structure
laser spirit
level
Measuring structure
band tape
Measuring structure

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Absen AW Series and is the answer not in the manual?

Absen AW Series Specifications

General IconGeneral
BrandAbsen
ModelAW Series
CategoryIndustrial Monitor
LanguageEnglish

Related product manuals