Do you have a question about the Accudyne Industries Milton Roy Milroyal Series and is the answer not in the manual?
Brand | Accudyne Industries |
---|---|
Model | Milton Roy Milroyal Series |
Category | Water Pump |
Language | English |
Wear protective clothing, face shield, safety glasses, and gloves.
Ensure power is off, earth the pump, and match motor protection to rated current.
Verify material compatibility for wetted components with the pumped solution.
Depressurize suction and discharge lines before servicing to avoid chemical contact.
Install safety/pressure-relief valve to protect against over-pressure damage.
Read manual, use trained personnel, be aware of hazardous voltages and chemicals.
Procedure for replacing failed ECC circuit boards with retrofit kits.
Connect input signal, feedback output, and input power via terminal blocks. Use proper conduit.
Steps for installing new circuit boards and necessary modifications.
Steps for initial setup: fill pump, check connections, apply signal and power, check travel.
Adjust zero, span, upper limit, and lower limit potentiometers on the circuit board.
Detailed steps for removing and installing the ECC circuit board.
Procedures for synchronizing the ECC with the pump, requiring qualified personnel.
Solutions for ECC failure to respond to the command signal.