Acer Acer –LCD-B&V223HQ
48
Assembly and Disassembly (continue)
S10
Twist
PCBA
screw
Fix 5 pcs of screws separately on the
poweboard and mainboard like the
attached Picture1
S11
Twist
Hexagonal
screws
(1). Handle hexagonal screws and
electric opener
(2). Twist screw in the interface like the
attached Picture1.
(3). Place cushion on the designated
location after iron frame is taken away.
S12 Fix chassis
Thread lamp wire into the relevant hole of
chassis like the attached Picture
2
1
34
2
3
4
5