PRE – DELIVERY LIST, TO BE COMPLETED BY THE MANUFACTURER AND
DEALER MANUFACTURER P-D-I
Signs and safety stickers fitted
Overall machine in good condition (
free from rust and burrs)
Serial plate on frame and serial plate fitted
All guards fitted correctly and bolted down
Sufficient tension in the conveyor belt
Sufficient tension in the vee
Hydraulic pipes fitted correctly
Side skirt retainers removed
Brackets or tilt (where applicable) fitted correctly
Auger bearing in place and bolts tight
Manufacturer P-D-I officer____________________________________ Date ____________
DELIVERY INSPECTION (DEALER)
Machine delivered without transport damage
Ensure all pictograms are in place
Machine delivered as per specification by the dealer
PRE-INSTALLATION INSPECTION (DEALER)
Check all conveyor nuts and bolts
Ensure machine operates correctly
Ensure conveyor operates correctly (inline)
operate in correct directions
hydraulic fittings are tightened
Ensure all guards and shields are fitted and secure
Run machine and check for smooth operation
Ensure, if fitted the brackets for connection are fitted correctly
operator fully understands the operation of the machine
This machine must not be released for delivery until the inspector has performed the pre-delivery
inspection in accordance with the above requirements.
Dealer Branch ________________________________ Date___________________
Dealer P-D-I inspector ________________________________
thanks you for your purchase and we wish you safe and productive use of this machine.
This check list should be used in conjunction with the operators
IMPORTANT: - manual. Before starting, removing any parts packed, read the operators manual
.