After finishing the procedure
1. At the start of each bale, move continuously between intake of the
swath on the left and right side of the pick-up. Do this until the set work
pressure is correct on the pressure gauge (4).
2. Drive straight for 10 – 20 m (33 – 66 ft) with the swath to go in on the
right side of the pick-up.
3. Move to the other side and drive 10 – 20 m (33 – 66 ft) with the swath
to go in on the left side of the pick-up.
Do steps 2 and 3 and frequently and examine the belts (2).
Examine and do the work as follows:
1. Look from the tractor and at the belt.
2. Make sure that the belts are in their correct position and no material
falls from the clearance (1) between the belts.
3. If material falls from one side, immediately drive to the other side of
the swath. The material will go in on the other side of the pick-up.
(When material falls from one side, the baling chamber is not filled
suciently at that side).
GUID-29FFAC80-CF80-467C-8EB4-34762129EF36-high.jpg [High]
Fig. 46 Belts.
(1)
Bale size indicator. (2) Pressure gauge.
3. Operation
100 Baler Wrapper Combination
4900.LE.EN01

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the AGCO LELY RPC 130 F and is the answer not in the manual?

AGCO LELY RPC 130 F Specifications

General IconGeneral
BrandAGCO
ModelLELY RPC 130 F
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals