5 5Powering
Overview
...................................................................................................................................................................................................................................
Purpose
This chapter describes the powering of the 1643 AM/AMS system and some final tests
which should be performed to end the physical installation part.
Assumption
All units/network elements (NEs) must be mounted and cabled correctly (see Chapters
3 and 4).
Contents
Power initialisation 5-2
Switching on and testing supply voltage 5-3
Fan unit test 5-4
Physical installation check 5-5
AM/AMS unit installation 5-6
Cable connections 5-7
Physical and power installation exit checklist 5-8
...................................................................................................................................................................................................................................
365-312-802R7.2
Issue 4, June 2007
Alcatel-Lucent - Proprietary
See notice on first page
5-1