Sequence of steps
...................................................................................................................................................................................................................................
Overview
This manual is structured according to the sequence of steps that should be observed
when installing 1642 AM and 1643 AMS units. The table below gives an overview of
all needed installation steps which are described in detail in the following chapters.
NOTE: The manual also contains background information needed for performing some
procedures. These sections are not reflected in the table below.
Sequence
The following table shows the sequence of steps for installing a 1642 AM and 1643
AMS system.
Main task Chapter number Subtask [section/page]
Mechanical
installation
3 “Installation of an option card” (p. 3-7) (AM) or
“Installation of an option card” (p. 3-21) (AMS)
“Mounting the EMC bracket” (p. 3-9) (AM) or
“Mounting the EMC bracket” (p. 3-23) (AMS)
“AM unit installation” (p. 3-12) or
“AMS unit installation” (p. 3-26)