EasyManua.ls Logo

Alcatel-Lucent 9500 MPR - Page 13

Alcatel-Lucent 9500 MPR
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3EM23953AB
Issue 01, February 2010
Prepare Floor
1-3
Chart-2
Chart-2
Prepare Floor
PURPOSE
This chart details the standard procedure for rack installation floor preparation. The two types of
racks that can be installed are the standard rack and the seismic.
GENERAL
Equipment racks are designed for fixed-location installation. Standard and seismic rack assemblies
are available.
Alcatel-Lucent provides expert Installation Services for installations that have different
requirements from the recommended configuration as outlined in this manual. Contact the
Alcatel-Lucent Technical Support Center at 1-(888) 252-2832 for details.
PREREQUISITE
Complete Chart-1 Unpack and Inspect Equipment.
RECOMMENDED TOOLS
Safety glasses
Anchor setting tool (Redhead RT58 or equivalent)
Chalk line with chalk
Extension cord (50-foot)
Felt marking pens
Hammer, claw (24 to 40 ounces)
Roll of cellophane tape
Rotary impact drill and associated drill bits
Steel tape measure (25-foot)
Insulated trouble lamp (droplight—Duralamp, or equivalent)
Vacuum cleaner, High Efficiency Particulate Arrester (HEPA)

Other manuals for Alcatel-Lucent 9500 MPR

Related product manuals