Index
I–3
Publication 1336 IMPACT-6.2 – March 1998
N
Nameplate Location, P–3
Not External Fault Input, Definition, P–11
O
Objective of this Manual, P–1
Operation, Human Interface Module, 1–12
Option
Identification, P–4
L Option Board, 1–2
P
Parameter, Definition, P–11
Power Module
Illustration, 5–11
Installation, 5–12
Removal, 5–11
Test, 4–8
Precautions
Electrostatic Discharge, P–2
Safety, P–1
Precharge Board
Illustration, 3–13
Installation, 3–14
Removal, 3–13
Test, 4–14
Press, Definition, P–12
Procedures
Bus Capacitor Bank Installation, 5–23
Bus Capacitor Bank Removal, 5–21
Bus Capacitor Bank Test, 4–5
Bus Fuse F1 Installation, 5–8
Bus Fuse F1 Removal, 5–8
Bus Fuse F1 Test, 4–10
Component Test, 4–1
Control Interface L-Option Board
Installation, 3–8
Control Interface L-Option Board
Removal, 3–7
DC Bus Inductor Installation, 5–20
DC Bus Inductor Removal, 5–19
Drive Enclosure Installation, 3–6
Drive Enclosure Removal, 3–6
Fan Installation, 5–17
Fan Removal, 5–16
Gate Driver Board Installation, 3–16
Gate Driver Board Removal, 3–15
Gate Driver Board Test, 4–12
Ground Sense CT Installation, 5–6
Ground Sense CT Removal, 5–4
Input Rectifier Installation, 5–14
Input Rectifier Removal, 5–13
Input Rectifier Test, 4–3
Main Control Board Installation, 3–12
Main Control Board Mounting Plate
Installation, 3–10
Main Control Board Mounting Plate
Removal, 3–9
Main Control Board Removal, 3–11
Major Component Replacement, 5–2
Power Module Installation, 5–12
Power Module Removal, 5–11
Power Module Test, 4–8
Precharge Board Installation, 3–14
Precharge Board Removal, 3–13
Precharge Board Test, 4–14
Replacement Part, 5–1
Snubber Board Installation, 3–19
Snubber Board Removal, 3–17
Thermistor Installation, 5–10
Thermistor Removal, 5–9
Thermistor Test, 4–16
Programming
L Option Mode, 1–4
Local, 1–5
R
Rating, Drive, P–9
Related Publications, P–12
Replacement Part Procedures, 5–1
Replacement Parts, 6–1
S
Safety Precautions, P–1
Schematics, 7–1
Snubber Board
Illustration, 3–17
Installation, 3–19
Removal, 3–17
Speed Select, Input State, 1–8
T
TB3 Terminal Designations, 1–5
Terminal Block Locations, 1–2
Terminal Designations, TB3, 1–5
Termistor, Test, 4–16
Thermistor
Illustration, 5–9
Installation, 5–10
Removal, 5–9
AB Spares