EasyManua.ls Logo

Allied Telesis AT-SBx908 Gen2 - Figure 82: Switch Initialization Messages (Continued)

Allied Telesis AT-SBx908 Gen2
168 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
AT-SBx908 Gen2 Switch Installation Guide
113
Figure 82. Switch Initialization Messages (Continued)
After the switch has initialized its management software, go to “Verifying
the Hardware Operations of the Chassis” on page 114.
Assigning Active Workload to HA processes:
hsl, authd, epsrd, imi, imiproxyd, irdpd, lacpd
lldpd, loopprotd, mstpd, nsm, ospfd, ripd, rmond
sflowd, vrrpd
Received event network.activated
Loading default configuration
....
done!
Received event network.configured
awplus login:

Table of Contents

Related product manuals