Chapter 3: Installing the Chassis
64
Figure 30. Lowering the Locking Handle on the AT-SBxPWRSYS2 AC
Power Supply
6. Visually inspect the power supply to be sure that its faceplate is flush
against the front panel of the chassis and the locking handle is fully
down.
7. If necessary, repeat this procedure to install a second power supply.
8. After installing the power supplies, go to “Installing Ethernet Line
Cards” on page 69.