EasyManua.ls Logo

Allied Telesis CentreCOM GS970M Series - Installation Procedures

Allied Telesis CentreCOM GS970M Series
100 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GS9790M Series Switch Installation Guide
35
Table 7 describes the Link/Activity/Speed and PoE status LEDs.
T
ABLE 7. LINK/ACTIVITY/SPEED AND POE LED DESCRIPTIONS
LED State Description
Link/Activity/
S
peed
(LEFT LED)
Off
The port has not established a link with a
n
etwork device, or the ecofriendly feature
is enabled
Flashing
green
Rx or Tx activities at 1000M
Steady
green
The port has established a link with a
n
etwork device and is active (1000M)
Flashing
amber
Rx or Tx activities at 10/100M
Steady
amber
The port has established a link with a
n
etwork device and is active (10/100M)
PoE
(RIGHT LED)
Off
No link, no power output, or ecofriendly
fe
ature is enabled
Steady
green
PD is on
Flashing
amber
PD maximum current
Steady
amber
PD error

Table of Contents

Other manuals for Allied Telesis CentreCOM GS970M Series

Related product manuals