EasyManua.ls Logo

Alstom FKG1X - Page 126

Alstom FKG1X
274 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
Assembly of th
e circuit b
reaker on-
-
site
G31--201EN12
9/20
04--2011
© ALSTOM 2010. All rights reserved. Informat
ion contained in
this document is indicative only. No
representati
on or
warrant
y is
given or should
be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liabili
ty and
is subject to
change without notice. Reproduction, use or disclosure to
third parties, without express writt
en authority, is
strictly prohibited.
GRID
Control insulation
Process
Before
continui
ng
erection
checki
ng
beetwen
enclos
ure/fram
insula
tion
for
the 3 poles.
POLE EN-
CLOSURE
POLE
FRAME
FOR THE 3 POLES CHECK
ENCLOSURE/FRAME INSULATION
R
INSULATING
BRACE

Related product manuals