© ALSTOM 2010. All rights reserved. Informat
this document is indicative only. No
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
change without notice. Reproduction, use or disclosure to
third parties, without express writt
for overhauling after the
respect of these directives.
Potential transformer(s) with a fuse
It is imperative to respect the order of assembly :
-holder braid to the circuit
tions by applying the proce
tact surfaces” and “Bolting and tightening torques”,
Potential transformer(s) without a fuse
It is imperative to respect the order of assembly :
of the electrical contact surfaces” and “Bolting and tightening torques”,
tact surfaces” and “Bolting and tightening torques”.
tact surfaces” and “Bolting and tightening torques”.
Protect the interior of the equipment by temporarily remounting the metal
cal contact surfaces” and “Bolting and tightening torques”.
Following the dielectric test carried out later
whilst following the direc-
tives of the “precautions for the equipment before dielectric testing”
continue the chronological order for assembly of the device as described in