Commissioning
Pre-
-
commissioning
inspections
G34
-
-0
01EN04
7/8
02--2011
© ALSTOM 2010. All rights reserved. Informat
ion contained in
this document is indicative only. No
representati
on or
warrant
y is
given or should
be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liabili
ty and
is subject to
change without notice. Reproduction, use or disclosure to
third parties, without express writt
en authority, is
strictly prohibited.
GRID
Prepa
ring for
resum
ption of
servi
ce
Prepa
ring for
re-
sumptio
n
of
servi
ce
-
-
Re-ins
tall cover and sun visor (where applicab
le), see module :
“Conn
ec-
tion with preparation of contact surfaces”.
-
-
Check cove
r tightness if
the enclosure is under press
ure.
-
-
Re-energize electrical power
and monitoring control circuits (motor power
supply, heating, lighting).
-
-
Open all the HV appa
ratus of the bay by means of local operating mec
ha-
nism.