STEP 5. Have two people lift the fireplace box and put it into the hole. Fix the FOUR wall screws in
each side of the fireplace box. Figure (F)
Figure ( F )
STEP 6. Place the Decorative Crystals and Drift Log pieces on the designed slot and keep them even.
Figure (G)
Figure ( G )
STEP 7. After placing the Decorative Crystals or Pebbles on the designed slot, fasten screws back on
the glass panel and metal trim.
(Repeat as Fig B,C,D,E)