990-4618A-001 InRow™ Chilled Water Air Conditioners Technical Specifications 61
C. SERVICE ACCESS
1. At least 914.4 mm (36 in) of clear space must be left in front of and behind the unit for routine
service. In order to service the unit outside of the row, an area of 1219.2 mm (48 in) of clear space
is required in front of and behind the unit while it is in the row.
D. RECEIVING THE UNIT
1. Your InRow CW unit has been completely tested and inspected before shipment. To ensure that
you have received the unit in excellent condition, perform a careful inspection of the crating and
the unit immediately upon receipt.
2. Verify that all parts ordered were received as specified and that the unit is the correct size and
voltage necessary to fulfill your environmental control needs.
3. Report any damage discovered to the freight carrier.
4. If necessary, contact the APC field service department for help in repairing or replacing damaged
parts. While APC is not responsible for damage incurred in transit, we want to make sure that you
have no undue delays in your system start-up.
E. RIGGING
1. The unit is manufactured with a formed steel frame for maximum strength and unit integrity.
However, as with all electrical and mechanical equipment, you must take care with proper rigging
of your unit.
2. When using a forklift to move the unit, use the shipping skid to protect the bottom of the unit.
When using chains, cables, or rope to lift the unit, use spreader bars to prevent damage to the
finished panels. Four threaded M10x16 holes are provided to accommodate lifting eye bolts that
can be utilized to lift the unit.
F. CONDENSATE DRAIN ROUTING
1. ACRC100 series—Condensate from the evaporator pan is collected and discharged by the
condensate pump to a 5 mm (0.188 in ID) condensate line supplied with the unit. Additional
condensate piping is required to route the condensate line to the building.
2. ACRC500 series—Condensate from the evaporator pan is collected and discharged by the
condensate pump to a 9.5 mm (0.375 in ID) condensate line supplied with the unit. Additional
condensate piping is required to route the condensate line to the building.
3.2 FIELD QUALITY CONTROL
A. APPLICATION OF GUIDE SPECIFICATIONS
1. Because of an ongoing program dedicated to product improvement, specifications are subject to
revisions without notice. APC by Schneider Electric assumes no responsibility, and disclaims all
liability for damages resulting from use of this information or for any errors or omissions.