1
Thank you for choosing APEC reverse osmosis systems.
You now own the finest water filter in America.
Please read and become familiar with instructions and parts needed before proceeding with the
installation.
BEFORE INSTALLATION:
Inspect the system:
Please take the system and all the components out of the box. Inspect the system and all the
connection fittings carefully, make sure nothing is damaged during shipping. If any part is cracked
or broken, please do not proceed with the installation and contact APEC or your distributor for an
exchange or diagnosis.
Recommended tools list:
x Variable speed drill
x Drill bit:
1/4” (for the waste line), 1/8” (as pilot, not mandatory), and 1/2” (for standard
faucet hole, air-gap faucet requires 1&1/4” hole)
x 5/8”, 9/16” open-end wrench, or adjustable wrench, pliers
x Phillips screwdriver
x Utility knife, or scissors
x Teflon tape
Operating Parameter
x Operating pressure: 85psi maximum
x Feed water temperature: 40 – 100 °F (4-37 °C)
x Feed water TDS level: 2000ppm maximum
x Do not connect this unit to hot water source
x Install the RO in a sheltered environment, avoid exposure to hot and cold weather or under
direct sunlight.
Copyright:
This manual is copyrighted by APEC Inc. Under the copyright laws, this manual may not be reproduced in any form, in
whole or part, without the prior written consent of APEC Inc. Manual print ver. 4.0, 2018 Apr.
General Installation/Operation/Maintenance Requirements
x Installation needs to comply with state and local laws and regulations.
x System must be installed indoor away from possible environmental damage
x Do not use with water that is microbiologically unsafe or of unknown quality without
adequate disinfection before or after system. Systems certified for cyst reduction may be
used on disinfected water that may contain filterable cysts.
x This reverse osmosis system contains a replaceable treatment component critical for
effective reduction of total dissolved solids. The product water shall be tested periodically to
verify that system is performing satisfactorily.
Thank you
or choosin
C reverse osmosis syste
ou now own th
est water
ilter in Am
Please read and become
amil
nstructions and parts needed be
or
eeding with the
in
ti
EFORE I
STALLATIO
:
n
ect the
stem:
lease take th
stem and all the components out o
t
Inspect the system and all the
onnection
care
ully, make sure nothing is da
during shipping. I
any part is crac
r broke
e do not proceed with the installa
contact APEC or your distributor
xch
agnosis.
ended tools list:
rill
it
or the w
,
8” (as pilot, not mandatory), an
or standard
aucet hole, air-gap
quires 1&1/4” hole
5/8”, 9/16”
d
ench, or adjustable wrench, pliers
hillips screw
tility kni
e, or
perating Parameter
Operating pressure: 85psi maximu
ed water temperature: 40 – 100 °F
C
ed water TDS level: 2000ppm m
D
n
connect this unit to h
w
sourc
nstall the RO in a sheltered
ent, avoid exposure to hot and c
her or unde
irect sunlight.
Copyright
This manual is copyrighted by APEC I
.
r the copyright laws, this manual may not
ced in any
orm, in
whole or
art, without the
rior wri
sent o
APEC Inc. Manual
rint ver. 4.0, 2
r.
eneral Installati
tion/Maintenance Requireme
nstallation n
comply with state and local laws and regulations.
System must be installed indoor away
rom possible environmental damag
o not use with water that is microbiologically unsa
e or o
unknown quality without
adequate disin
ection be
ore or a
ter system. Systems certi
ied
or cyst reduction may
used on disin
ected water that may contain
ilterable cysts.
This reverse osmosis system contai
eplaceable treatment component criti
ective reduction o
total dissolv
s. The product water shall be tested
cally to
veri
y that system is per
ormi
orily.