Do you have a question about the Asami AMV5-O335 and is the answer not in the manual?
Type | Split System |
---|---|
Cooling Capacity | 3.5 kW |
Power Supply | 220-240V, 50Hz |
Energy Efficiency Ratio (EER) | 3.2 |
Refrigerant | R410A |
Noise Level | 42 dB |
Dimensions (W x H x D) | 800 x 300 x 200 mm |
Identifies and illustrates the primary components of the outdoor unit for user reference.
Details various combinations of outdoor units available for system configuration.
Provides a table showing the number of connectable indoor units (IDU) for each ODU model.
Specifies the acceptable ambient temperature ranges for cooling and heating modes.
Lists the standard parts supplied by Gree for the installation process.
Details crucial site selection criteria and safety precautions for outdoor unit placement.
Specifies the technical requirements for refrigerant piping, including material and thickness.
Provides physical dimensions and mounting hole specifications for outdoor units.
Explains piping connection schematics and sequences for system setup.
Shows the specific piping sequence for different outdoor unit models.
Defines maximum allowable pipe lengths and height differences between units.
Details piping connections between multiple outdoor modules in a system.
Specifies pipe sizing for connections from outdoor units to the initial manifold.
Provides pipe sizes for connections between manifolds based on total upstream capacity.
Details piping for connections between indoor manifolds and the outdoor manifold.
Guides selection of indoor unit manifolds based on total downstream capacity.
Specifies pipe sizes for connections between manifolds on the indoor side.
Details pipe sizes for connections between indoor units and their respective manifolds.
Covers installation precautions and requirements for connecting refrigerant pipes.
Lists important safety and procedural precautions for installing connection pipes.
Explains the installation and configuration of Y-type manifolds for system branching.
Details requirements for thermal insulation of refrigerant pipes to prevent condensation.
Outlines guidelines for supporting and protecting refrigerant piping during installation.
Describes the process of removing air and charging the system with refrigerant.
Step-by-step instructions for purging air from the refrigeration system.
Details how to add refrigerant based on pipe length and system configuration.
Covers essential wiring precautions, power cord specifications, and earthing requirements.
Lists critical safety and regulatory guidelines for electrical wiring installation.
Explains how to correctly wire the power cord to the unit's power supply.
Provides instructions and warnings for connecting the main power cord to the unit.
Outlines the components and methods for system communication setup.
Lists the various communication links within the VRF system (ODU, IDU, controller).
Specifies the CAN bus mode for communication between units.
Guides the selection and connection of communication wires and materials.
Details how to select appropriate communication wire based on length and interference.
Explains different connection modes for system communication wiring.
Discusses auto-addressing technology and manual address setting for units.
Provides detailed steps and diagrams for connecting system communication lines.
Illustrates the wiring for communication between indoor and outdoor units.
Explains how to connect indoor units to wired controllers for system management.
Details the connection for duct type IDUs to light board remote receivers.
Describes how to connect central controlling units to the VRF system.
Diagrams for external electrical wiring of single and modular units.
Shows the external wiring connections for a single VRF unit.
Illustrates the external wiring for modular configurations of VRF units.
A comprehensive checklist of items to verify after unit installation.
Step-by-step guide for performing the initial operational test of the system.
Explains the different modes and steps for system debugging and setup.
Instructions for cleaning the outdoor unit's heat exchanger.
Advice on checking and maintaining the drain pipe for proper condensate removal.
Important checks to perform before operating the unit seasonally.
Tasks to perform after the unit has been in seasonal storage.
Information on purchasing and replacing unit parts.