5200 Series Programming Instructions
3
80-9352-0022-020 Rev 2 06/23
Copyright © 2023, ASSA ABLOY Accessories and Door Controls Group, Inc. All rights reserved. Reproduction in whole or in
part without the express written permission of ASSA ABLOY Accessories and Door Controls Group, Inc. is prohibited.
For direct power connections (without AC Power Plug
bracket installed):
1. With the building power feed turned off, route 120VAC
wiring through the conduit hole in backplate. (Figure 1)
2. Connect 120VAC power to the power supply (Figure 1):
‒ HOT to “L”
‒ NEUTRAL to“N”
‒ GROUND to Ground.
3. Wire any additional devices, such as electric strikes, to
the green Input and Relay terminal block connections.
(Figure 3) Refer to Input Connections and Output
Connections on page 11 for additional information.
With Optional AC Power Plug bracket installed:
1. Plug the female end of the provided AC Power cord
into the plug of the AC Power Bracket. (Figure 2).
Do not plug the male end of the cable into a power
source at this time.
2. Wire any additional devices, such as electric strikes, to
the green Input and Relay terminal block connections
(Figure 3). Refer to Input Connections and Output
Connections on page 11 for additional information.
Once initial power has been wired:
1. Turn on the building’s power feed, or if using the AC
Power Plug bracket, plug in the male end of the power
cable into a power source.
2. Press and hold the Factory Reset button until all
LEDs are lit, then release. (Refer to Figure 3 for LED
and Setup Button location.)
‒ The POWER LED on the control board will be
illuminated solid red.
NOTE: If red POWER LED is flashing, refer to the
Error Codes chart on page 12 or contact Technical
Product Support.
‒ The STATUS LED on the control board will flash
white every 2 seconds.
‒ The CLOSE button LED (located in the bank of
Setup Buttons) will flash orange steadily.
3. Confirm the ON/OFF/HO switch is in the ON position.
(Figure 4)
4. Program the operator using one of the following two
methods:
“Operator Setup via the Control Board” on page 4
“Operator Setup via Wi-Fi” on page 6
NOTE: Basic setup and programming can be
performed using either programming method.
Additional programming options are available
through Wi-Fi programming only.
Initial Operator Setup
Conduit
Hole
L, N and Ground
Connections
Figure 1
Figure 3
Shown in
the ON
Position
Input & Relay
Connections
Setup
Buttons
Status
LEDs
Figure 2
Figure 4