IB-2003
eries 40 Trans
ite -
tationary
onveyor
30
Unloading Conveyor
In some cases, conveyors are
shipped disassembled. The
method of assembly will vary
depending on the equipment
and resources available.
Typically a mobile crane will
be needed to hoist conveyor
sections and supports into
place.
If the conveyor arrives
disassembled use the
following procedure to unload
the conveyor.
1. Unload smaller
components fi rst: idlers,
conveyor belt, fasteners,
and hardware box.
2. Be careful not to drop the
conveyor belt when
unloading. Store the
conveyor belt with the core
horizontal until ready to
install. Storing conveyor
with the core vertical will
cause belt to become
deformed, making it diffi cult
to train.
Proper Storage Position for
Conveyor Belt
Core
These instructions contain
information for more than
one model of conveyor.
Some information may not
apply to your specifi c model.
NOTICE
3. Unload conveyor frame
sections(s) and place on a
firm level surface. Be
careful not to jerk or twist the
frame sections when
unloading.
The frame section(s) should
be placed on equally spaced
blocks to prevent damage to
the head and tail sections and
reduce stress on the conveyor
center section.