13
You may not start to operate the machine until you
have read these operating instructions, observed all
the instructions given and installed the machine as
described!
Keep the instructions in a safe place for future use.
C
C
o
o
n
n
t
t
e
e
n
n
t
t
s
s
Extent of delivery 13
EC Declaration of Conformity 13
Symbols original instructions 14
Symbols on the machine 14
Operating times 14
Proper use 14
Residual risks 15
Vibrations (hand arm vibrations)
15
Safety advices 15
Personal protective equiment
16
Safety instructions – before working
16
Safety instructions – operating
16
Safety instructions – while working
16
General safety instructions
16
Safety instructions for the earth auger
17
Behaviour in an emergency situation
17
Safe handling with fuels
17
Description of device / spare parts 18
Assembly 18
Preparing for startup 18
Fuelling
18
Mixing
18
Fuelling of the device
19
Start-up 19
Starting with cold engine
19
Stopping the engine
19
Starting with warm engine
19
Working with the earth auger
20
Maintenance and cleaning 20
Cleaning the air filter
20
Cleaning/replacing the fuel filter
20
Checking/replacing the spark plug
20
Silencer
20
Checking the ignition spark
21
Adjusting the carburetor (idle speed)
21
Checking the gearbox oil level /
refilling gearbox oil 21
Cleaning
21
Transport 21
Storage 21
Maintenance and cleaning schedule 22
Possible faults 23
Technical specifications 24
Guarantee 24
E
E
x
x
t
t
e
e
n
n
t
t
o
o
f
f
d
d
e
e
l
l
i
i
v
v
e
e
r
r
y
y
After unpacking, check the contents of the box for
completeness
possible transport damage.
Report any damage or missing items to your dealer, supplier or
the manufacturer immediately. Complaints made at a later date
will not be acknowledged.
1 Drive unit
3 Drills (Ø 100, 150, 200 mm)
1 Fuel mixing can
1 Tool bag containing
- 1 Allen key, size 4
- 1 Allen key, size 5
- 1 Allen key, size 6
- 1 Open-end wrench (size 8 and 10)
- 1 Open-end wrench (size 13 and 15)
- 1 Philips screw driver
- 1 Spark plug socket spanner
Original instruction
Assembly and operating instruction sheet
Warranty declaration
E
E
C
C
D
D
e
e
c
c
l
l
a
a
r
r
a
a
t
t
i
i
o
o
n
n
o
o
f
f
C
C
o
o
n
n
f
f
o
o
r
r
m
m
i
i
t
t
y
y
according to EC directive: 2006/42/EC.
We,
ATIKA GmbH
Josef-Drexler-Str. 8, 89331 Burgau
– Germany
herewith declare under our sole responsibility that the products
Erdlochbohrer (Gasoline engine earth auger) ELB 52
Serialnumber: 010000 – 030000
are conform with the above mentioned EC directives as well as
with the provisions of the guidelines below:
2014/30/EU.
Following harmonized standards have been applied:
EN ISO 12100:2010
Keeping of technical documents at:
ATIKA GmbH
– Technical bureau
Josef-Drexler-Str. 8, 89331 Burgau
– Germany
i.A.
Burgau, 04.05.2016 i.A.
G. Koppenstein
Engineering design management