X4 .......3-phase outlet socket
Provides phase L1, L2, L3, neutral and
earthing.
X5 .......3-phase outlet socket
Provides phase L1, L2, L3, neutral and
earthing.
X6 .......3-phase outlet socket
Provides phase L1, L2, L3, neutral and
earthing.
9.3.4 “Electricité de France” (EDF)
When the EDF-option is installed, the unit operates as
a standard unit when the neutral and the PE terminals
are connected to each other (see figure below). In this
case, an earth leakage at the side of the generator or at
the side of the load will switch off the circuit breaker.
When EDF-option is installed, the unit operates as
EDF-unit when the earthing, the PE and the PE EDF
terminals are connected to each other (see figure
below). In this case, an earth leakage at the side of the
generator will switch off the circuit breaker. An earth
leakage at the side of the load will not switch off the
circuit breaker.
Circuit breaker Q1 does not only
interrupt the power supply towards
socket X1 but also towards X2, X3,
X4, X5 and X6.
Make sure to switch on circuit
breakers Q1, Q2, Q3, Q4, Q5 and Q6
after starting the generator when
power is supplied by means of X2,
X3, X4, X5 and X6.
Changing the operation mode from
standard unit to EDF-unit or vice
versa has to be carried out by a
qualified person from “Electricité de
France”.