- 34 -
(**) The power management system (PMS) allows communication between the Qc4002™ modules over CAN-bus. It has a fully intelligent system, which will start/load/stop the
generator according to the actual load and to the status of each generator. The installation can contain up to 16 Qc4002™ modules. If the Mains is included in the installation, then
an extra Qc4002™ module is required. The installation can be monitored and controlled via the PMS Software Package. For details on this application, please contact Atlas Copco.
Main Power Export
SEMI-AUTO mode PMS + Qc4002™ Mains module (**)
AUTO mode PMS + Qc4002™ Mains module (**)
Power Management System
(SEMI-AUTO mode) PMS + Qc4002™ Mains module (**)
AUTO mode PMS + Qc4002™ Mains module (**)
1.Each installation has to be prepared and reviewed very carefully before start-up. Wrong or incomplete wirings can damage the installation brutally !
2.Each application requires a specific combination of the following parameters:
- Auto/ Semi-auto / Test / Manual / Block mode.
- Island / AMF / PS / FP / LTO / MPE / PMS application type (in AUTO mode PS / FP / LTO can be combined with AMF).
- Back synchronising enabled/disabled (parameter channel 7080).
Wrong parameter settings can damage the installation brutally !
3.To be able to start up in cold conditions, parameter 6181 (Start prepare) can be changed to a higher value to have some preheating. Do not put this value
above 60 seconds to avoid any possible damage.
4.For more information on the Qc4002™ module and its applications, we refer to the Qc4002™ User manual. If you need more assistance, please contact
Atlas Copco.