Maintenance Schedule 29
BP8000
Maintenance Schedule
Monthly:
1. Re-torque the anchor bolts to 80-117 foot lbs.;
2. Check all connectors, bolts and pins to insure proper mounting;
3. Lubricate cable with lubricant;
4. Make a visual inspection of all hydraulic hoses/lines for possible wear or
leakage;
5. Check Safety device and make sure it is working properly;
6. Lubricate all Rollers and Pins with 90wt. Gear oil or equivalent;
7. Lubricate all 4 corners of the inside of the column as needed with White
Lithium or something similar. This provides good coverage and saves the life
of the wear blocks and keeps carriage true to column)
Note: All anchor bolts should take full torque. If any of the bolts do
not function for any reason, DO NOT use the lift until the bolt has been
replaced.
Every six months:
1. Make a visual inspection of all moving parts for possible wear, interference or
damage.
2. Check and adjust as necessary the equalizing tension of the cables to insure
level lifting.
3. Check columns for plumb.
4. Check Rubber Pads and replace as necessary.
5. Check Safety locks for proper operation.