EasyManua.ls Logo

Audi A8 2010 - Removing and Installing High-Pressure Pipe

Audi A8 2010
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Protected by copyright. Copying for private or commercial purposes, in part or in whole, is not
permitted unless authorised by AUDI AG. AUDI AG does not guarantee or accept any liability
with respect to the correctness of information in this document. Copyright by AUDI AG.
Do not alter shape
Check for damage before re-installing
Lubricate thread of union nut with fuel
25 Nm
8 - Gasket
Renew
9 - Housing
10 - Hall sender -G40-
Removing and installing ⇒ page 55
11 - Bolt
9 Nm
12 - O-ring
Renew
13 - Protective plate
For high-pressure pipe
14 - Nut
9 Nm
15 - Threaded pin
9 Nm
16 - Roller tappet
Can only be installed in one position
Lubricate lightly with clean engine oil before installing
17 - O-ring
Renew
Lubricate lightly with clean engine oil before installing
High-pressure pump - tightening torque and sequence
Tighten bolts in 2 stages as follows:
Stage Bolts Tightening torque
1. -arrows- Screw in bolts by hand until they make
contact
2. -arrows- Tighten in stages; final torque 20 Nm
2.15 Removing and installing high-pressure
pipe
Special tools and workshop equipment required
Audi A8 2010 ➤
Simos direct petrol injection and ignition system (6-cyl. 3.0 ltr. TFSI 4-valve) - Edition 12.2011
2. Injection system 37

Table of Contents

Other manuals for Audi A8 2010

Related product manuals