EasyManua.ls Logo

Audi Q5 2017 - Page 89

Audi Q5 2017
113 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Note
Place a cloth underneath to catch escaping coolant.
Clamp off coolant hoses using hose clamps up to 25 mm -
3094- and disconnect hoses (release hose clips -1, 2-).
Place used oil collection and extraction unit - VAS 6622A- un‐
derneath.
Unscrew bolts -1, 2, 3- and detach bracket.
Detach ATF cooler -2- from ATF pipe -1-.
Seal off open lines and connections with clean plugs from en‐
gine bung set - VAS 6122- .
Detach ATF pipe.
Installing
Installation is carried out in reverse order; note the following:
Note
Renew ATF pipe with seals after removal.
Clean ATF cooler before installing.
Caution
Risk of leaks at ATF cooler!
Note installation position of ATF pipe.
Pipe end with three seals faces ATF cooler.
Screw in bolts by hand until they make contact and then tighten
to specified torque.
If bolts are not accessible, tighten using Torx screwdriver bit
T30 - VAS 6959- .
Check ATF level ⇒ page 91 .
Tightening torques
⇒ Fig. ““ATF cooler - tightening torque and sequence”“ , page
82
Audi A4 2015 ➤ , Audi A4 Avant 2015 ➤ , Audi A4 China 2016 ➤ , Audi A4 a ...
7-speed dual clutch gearbox 0CJ, 0CK, 0CL, 0DN, 0DP - Edition 08.2018
7. ATF circuit 85

Table of Contents

Other manuals for Audi Q5 2017

Related product manuals