Audi Q7 2007 !
6-cylinder TDI engine (3.0 ltr. 4-valve common rail), mechanics 01.2006
Repair Group 15 – Cylinder head, valve gear
6
106
17 - Copper seal
" Renew
18 - Special bolt, 9 Nm
" Renew if damaged or leaking
" Tighten in stages and in diagonal sequence
19 - Cylinder head cover
" Removing and installing ⇒ page 107
20 - Gasket for cylinder head cover
" Renew if damaged or leaking
Tightening high-pressure pipe connections at rail elements
– Tighten union nuts on high-pressure pipes finger-tight ini-
tially.
– Ensure that high-pressure pipes are not under tension.
– To tighten unions of high-pressure pipes, use torque
wrench -V.A.G 1331- and tool insert, 19 mm
-V.A.G 1331/5-.
• Tightening torque: 25 Nm.
Tightening high-pressure pipes at injectors
– Tighten union nuts on high-pressure pipes finger-tight ini-
tially.
– Ensure that high-pressure pipes are not under tension.
– To tighten unions of high-pressure pipes at injectors, use
torque wrench -V.A.G 1331- with ratchet -V.A.G 1331/1-
and socket, 17 mm -T40055-.
• Tightening torque: 25 Nm.
更多资料请访问深度汽车论坛 http://shenduauto.com/ 客服QQ:1398556747 电话:18218750259