Audi Q7 2007 !
6-cylinder TDI engine (3.0 ltr. 4-valve common rail), mechanics 01.2006
Repair Group 19 – Cooling
6
172
– Install poly V-belt ⇒ page 39.
– Fill cooling system ⇒ page 162.
Tightening torque
1.7 Removing and installing coolant tempera-
ture sender -G62-
Removing
– Drain off coolant ⇒ page 161.
– Carefully pull engine cover panel off four retaining pins one
after the other -arrows-.
– Remove air intake hose -arrows-.
– Unplug electrical connector -1- at coolant temperature
sender -G62-.
– Detach retaining clip -2- and remove coolant temperature
sender -G62-.
Installing
Installation is carried out in the reverse order; note the follow-
ing:
♦ Renew O-ring.
♦ Secure all hose connections with the correct type of hose
clips (same as original equipment) ⇒ Parts catalogue.
– Fill cooling system ⇒ page 162.
Component Nm
Hose connection with thermostat to engine 9
Note
更多资料请访问深度汽车论坛 http://shenduauto.com/ 客服QQ:1398556747 电话:18218750259