EasyManua.ls Logo

Audi Q7 2007 - Removing and Installing Coolant Pipe (Rear Right)

Audi Q7 2007
228 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Audi Q7 2007 !
6-cylinder TDI engine (3.0 ltr. 4-valve common rail), mechanics 01.2006
1 Removing and installing parts of cooling system
181
6
Remove bolts -1- and -2-.
Pull coolant pipe (right-side) towards front and out of cyl-
inder block and remove.
Installing
Installation is carried out in the reverse order; note the follow-
ing:
Renew O-rings.
Hose connections and hoses for charge air system must be
free of oil and grease before assembly.
Secure all hose connections with the correct type of hose
clips (same as original equipment) Parts catalogue.
Before installing, clean and smoothen sealing surface for
O-ring.
Lubricate new O-ring with “G12+” and slide onto coolant
pipe.
Install toothed belt for high-pressure pump page 48.
Remove alternator Rep. Gr. 27.
Install poly V-belt page 39.
Observe notes on procedures required after connecting
battery Rep. Gr. 27.
Fill cooling system page 162.
Tightening torques
1.12 Removing and installing coolant pipe (rear
right)
Special tools and workshop equipment required
Component Nm
Coolant pipe (right-side) to engine 9
Poly V-belt pulley to coolant pump 22
Toothed belt cover (rear) to: cylinder
head
9
mounting
bracket
9
Toothed belt sprocket to high-pressure
pump
70
Toothed belt sprocket to camshaft 75
Engine support to cylinder block 60
Engine support to engine mounting 75
Battery plus (+) cable to starter 16
Hose clips Width 9 mm 3
Width 13
mm
5.5
Note
更多资料请访问深度汽车论坛 http://shenduauto.com/ 客服QQ:1398556747 电话:18218750259

Table of Contents

Other manuals for Audi Q7 2007

Related product manuals