EasyManua.ls Logo

Augury AC00013 - Halo Node Installation Overview; Node Installation Safety Guidelines

Default Icon
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Halo Node installation
The Node is the “Brain” of the Halo system and is the bridge that enables the
communication to the Endpoints while connected to the internet either via wifi or
Ethernet Cable.
The main function of the Augury Node is to transfer data back and forth between
the Endpoints and the Augury backend. The Node enables data to be uploaded
from the Endpoints and to the backend to download configurations and “Over the
Air” (OTA) updates to the Endpoints.
The Node is installed only as part of a full Augury Halo system installation, by
certified Augury installers.
To become a certified Augury installer you must complete the Augury training
and understand the safety and technical limitations of the system and the
installation sites.
Safety
1. This equipment is not suitable for use in locations where children are likely to be
present.
2. The Node must be connected to a socket-outlet with earthing/grounding connection.
3. When installing the Node the responsible party or integrator shall use 100-240VAC
power input. And be compliant with local Electrical Codes and Regulations.
4. The max. ambient operating temperature is -2585
5. Wi-Fi highest rated output power: 20 dBm.
6. BLE highest rated output power: 9 dBm.
7. Wi-Fi and BLE frequency band: 2400MHz - 2483.5 MHz
8. Marking on the product

2