10. Checklists
10.1. Commissioning checklist
Table 9: Commissioning checklist
⎕ ✓1. Fail safe unit, actuator and actuator controls correctly wired?
⎕ ✓2. Actuator limit and torque switching setting complete?
⎕ ✓3. End positions of fail safe unit correctly set?
⎕ ✓4. Safe function (depending on the configuration) checked in accordance with the proof
test checklists?
⎕
Yes
⎕ No
5. Commissioning of basic settings (actuator controls) performed in accordance with
the operation instructions?
☒ ✓ = Executed
10.2. Proof test checklists
If the proof test is performed according to proof test checklists, the pertaining
NOTICES contained in the <Tests and maintenance> chapter have to be observed.
The test step sequence must be respected.
10.2.1. Safe ESD safety operation (Safe OPENING/CLOSING)
Proof test checklist for version or configuration:
●
Safe ESD function “Safe CLOSING” (Safe ESD in direction CLOSE)
●
Safe ESD function “Safe OPENING” (Safe ESD in direction OPEN)
Table 10: Proof test checklist
✎Configuration
Safe OPENING
(ESD in direction fail safe position OPEN)
✎Configuration
Safe CLOSING
(ESD in direction fail safe position CLOSED)
⎕ ✓1. Actuator in end position CLOSED?⎕ ✓1. Actuator in end position OPEN?
⎕ ✓2. Fail safe fault signal?
FS failure NC (NC contact) output = open
(“FS ready” signal)
⎕ ✓2. Fail safe fault signal?
FS failure NC (NC contact) output = open
(“FS ready” signal)
⎕ ✓
3. ESD input signal set to 0 V (low)?
(execute operating time measurement)
⎕ ✓
3. ESD input signal set to 0 V (low)?
(execute operating time measurement)
⎕ Yes
⎕ No
➥ Check reaction of fail safe unit:
FQM operates in direction OPEN? (start of operating
time measurement)
⎕ Yes
⎕ No
➥ Check reaction of fail safe unit:
FQM operates in direction CLOSE? (start of operating
time measurement)
⎕ Yes
⎕ No
FQM reaches end position OPEN? (Operating time
measurement complete.)
⎕ Yes
⎕ No
FQM reaches end position CLOSED? (Operating time
measurement complete.)
⎕ Yes
⎕ No
FQM operating time corresponds to indications on
name plate for 90° swing angle or the configured op-
erating time?
Operating time [–50 %/+ 100 %]
⎕ Yes
⎕ No
FQM operating time corresponds to indications on
name plate for 90° swing angle or the configured op-
erating time?
Operating time [–50 %/+ 100 %]
⎕ Yes
⎕ No
➥ Check FS module signal behaviour:
Fail safe fault signal?
FS failure NC (NC contact) output = close
(“FS fault” signal)
⎕ Yes
⎕ No
➥ Check FS module signal behaviour:
Fail safe fault signal?
FS failure NC (NC contact) output = close
(“FS fault” signal)
⎕ ✓
4. ESD input signal set to +24 V (high)? Start of time
measurement.
⎕ ✓
4. ESD input signal set to +24 V (high)? Start of time
measurement.
33
with non safety-related actuators Checklists