Referring to Fig. 1 for recommended installation
1)
Track 4) Powerpoint / Power Cord
2)
PE Safety Beams 5) Light Cover
3)
Motor Powerhead
Fig.2
Fig.3
Maintaining a minimum gap of 30mm from the top panel’s maximum height (Fig. 2).
Make sure the track is horizontal and vertical to the shaft. Make sure the connection of
hanging
bracket F and ceiling is firm enough(Fig. 3).
Warning: Make sure the opener is affixed to noggins in ceiling and not to plasterboard.
Failure
to have a safe and secure fixing will lead to opener falling, and cause serious
persons and /or
property damage.