EasyManua.ls Logo

Avaya Converged Platform 130 Series - Page 24

Avaya Converged Platform 130 Series
86 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. Perform the following actions to install toolless rails (Square Hole or Round Hole Racks):
Task order Task
1 Position the left and right rail end pieces labeled FRONT facing inward and orient
each end piece to seat in the holes on the front side of the vertical rack flanges.
2 Align each end piece in the bottom and top holes of the desired rack spaces.
3 Engage the back end of the rail until it fully seats on the vertical rack flange and
the latch clicks into place.
4 Repeat these steps to position and seat the front end piece on the vertical rack
flange.
Installation
October 2019 Installing the Avaya Converged Platform 130 Series 24
Comments on this document? infodev@avaya.com

Table of Contents

Related product manuals