EasyManua.ls Logo

Avaya Definity SI - Page 1188

Avaya Definity SI
2968 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance Object Repair Procedures
555-233-123
10-402 Issue 4 May 2002
Circuit Pack Restart Test (#252)
NOTE:
This test is destructive.
Execute this test (not part of either short or long demand test sequence) to reset
the circuit pack only if there are PPCPU errors. This test fails if the circuit pack
does not return to a sane state after being reset. The circuit pack resets through
the SAKI Sanity Test (#53).
Table 10-147. Test #252 Circuit Pack Restart Test
Error
Code
Tes t
Result Description/Recommendation
None ABORT Could not allocate the necessary system resources to run test.
1. Retry the command at 1-minute intervals, up to 5 times.
2. If the problem persists, escalate the problem.
1015 ABORT Port is not out-of-service.
1. Busyout the circuit pack (busyout board UUCSS).
2. Retry the command at 1-minute intervals, up to 5 times.
3. If the problem persists, escalate the problem.
2100 ABORT Could not allocate the necessary system resources to run test.
1. Retry the command at 1-minute intervals, up to 5 times.
2. If the problem persists, escalate the problem.
1, 2 FAIL The circuit pack failed to reset.
1. Retry command at 1-minute intervals, up to 5 times.
2. If the problem persists, pull out and reseat the circuit pack.
3. If the problem persists, replace the circuit pack.
PASS The circuit pack initialized correctly.
Continued on next page

Table of Contents

Related product manuals