EasyManua.ls Logo

Avaya IP500 V2 - Tools and Equipment Required

Avaya IP500 V2
426 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
IP500/IP500 V2 Installation Page 73
15-601042 Issue 25i (03 January 2013)IP Office 8.0
IP500 V2 Installation:
4.1 Tools and Equipment Required
The following is a general summary of the tools required. Additional tools and equipment will be
required for wall and or rack mounting and to fashion ground cable connections suitable to local
requirements.
· Tools Required
· o 5mm Flat-blade screwdriver.
· o Crosshead screwdriver.
· o Anti-static wrist strap and ground point.
· o RJ45-RJ45 Ethernet LAN Cable.
· o M4 Cross-Head Screwdriver.
· o Tools suitable for crimping a cable spade.
· o If wall mounting, drills and tools for wall mounting fixtures.
· Additional Parts Required
In addition to orderable IP Office equipment, the following items will be required.
· o 14AWG Solid copper wire for ground connection of control units and expansion modules.
· o Cable sleeve matching local regulator requirements for ground wires. Typically green for a functional ground
and green/yellow for a protective ground.
· o If wall mounting, additional fixtures and fittings suitable for the wall type and mounting kit being used.
· o Cable ties and labels for tidying and identifying cables.
· System Administration
1.
o Selected method for system administration:
·
· Windows PC with IP Office Admin suite installed and RJ45 Ethernet LAN port.
2.
o SD Card reader.
65

Table of Contents

Other manuals for Avaya IP500 V2

Related product manuals