Issue 2 June 2005 47
At the customer site
Perform the tasks in this section at the customer site.
Task Steps/Comments
Go to the standard documentation
Use Installation and Upgrades for Avaya G700 Media Gateway and Avaya S8300 Media
Server, 555-234-100, Issue 8, April 2005.
To convert the ICC to an LSP, you complete selected tasks from Chapters 3 and 5. You need to
complete only some of the tasks in these chapters. The specific tasks are identified by page
number in the left-hand column. The subtasks to perform or skip are listed in the right-hand
column.
It is important to note where the task is performed. Most of the tasks are done on a server or
gateway — on the ICC/LSP S8300, on the primary controller for the LSP, on a DHCP server, or
on the gateway processor (MGP). The headings in the table indicate on which of these devices
the task is performed.
On the new LSP’s primary controller
1. Administer the primary
controller that the LSP
(after conversion) will use.
Start on page 157 if the
primary controller is an
S8300.
Start on page 163 if the
primary controller is an
S8700 or S8500.
Assign node names
Administer network regions
Associate LSP with a network region
Administer the LSP screen
2. Administer the media
gateway.
Starting on page 170.
Add media gateway
Repeat for each gateway controlled by the current
ICC.
For this scenario, the gateway will not automatically
register with the primary controller at this point. Skip the
subtasks Verify Changes and Save Translations in this
section.
When the gateway finally registers, the media modules
will automatically populate, unless you are doing
administration without hardware (AWOH). In this case,
you will have to enter the media module types for each
slot.